首页> 外文期刊>Compliance engineering >Ensuring a Successful Visit to the EMC Test Lab
【24h】

Ensuring a Successful Visit to the EMC Test Lab

机译:Ensuring a Successful Visit to the EMC Test Lab

获取原文
获取原文并翻译 | 示例
           

摘要

If you're in the business of making or selling electronic products anywhere in the world, you've likely had your product tested at an EMC test laboratory for radio-frequency (RF) emissions, immunity, or both. Everyone would like the testing process to be a painless experience, but often problems arise that can delay testing and maybe even the product's schedule. Sometimes equipment fails a portion of a test. Sometimes the product may self-destruct. Sometimes communications get crossed between the manufacturer and the test lab. Proper planning and preparation for each project can prevent such problems and ensure a productive and successful visit. This article presents an overview of how to prepare for the visit. See the checklist in the sidebar "Emissions/Immunity Lab Visit Checklist" on page 39.

著录项

  • 来源
    《Compliance engineering》 |2003年第1期|38-41|共4页
  • 作者

    WILLIAM STUMPF;

  • 作者单位

    DLS Electronic Systems Inc. OATS testing facilities in Genoa City, WI;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类 电工技术;
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号