Corrosion Mitigation Activities Performed After the Fukushima Daiichi Accident

机译:Corrosion Mitigation Activities Performed After the Fukushima Daiichi Accident

获取原文
获取原文并翻译 | 示例
           

摘要

This synopsis describes corrosion issues and mitigation activities shortly after the Fukushima Dauchi Nuclear Power Station accident. An earthquake of magnitude 9.0 occurred on March 11, 2011; the subsequent tsunami removed the cooling capacity of fuels in both the reactors and spent fuel pools (SFPs). Seawater was temporarily used for emergency fuel cooling, which induced various corrosion issues. Just after the accident, the temperatures within the reactors of Units 1 to 3 increased to several hundred degrees Celsius and the water quality of the cooling water seems to have become similar to that of concentrated seawater. To stabilize the fuel cooling, corrosion mitigation actions were required for mainly carbon steel components. The following corrosion mitigation measures were applied to the reactors: (a) temperature decreases, (b) dissolved oxygen removal from feedwater via deaeration, (c) dissolved oxygen removal from cooling water in the reactors via nitrogen gas injection, (d) salt removal from cooling water, and (e) sterilization of feedwater by hydrazine addition. The temperatures of SFP water in Units 1 to 4 were between 47 degrees C and 93 degrees C just after the accident. The maximum chloride ion concentration was approximately 2,000 ppm and the pH was in the range from 7.5 to 11.2. The mitigation of localized corrosion of the stainless steel pool liners and alkaline corrosion of the aluminum fuel racks was the top priority. In addition to (a), b), and (d) listed above, (f) dissolved oxygen removal and sterilization by hydrazine addition and (g) pH control were applied to the SFPs. In the six years since the accident, no major corrosion problems have yet arisen. However, continued efforts to increase plant stability are underway for the longterm goal of decommissioning.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号