首页> 外文期刊>International Journal of Applied Engineering Research >The Effect of Dam and Weir on Intermixing During Grade Transition in Two Strand Slab Caster Tundish
【24h】

The Effect of Dam and Weir on Intermixing During Grade Transition in Two Strand Slab Caster Tundish

机译:大坝和堰对两流板坯连铸中间包梯度过渡过程中混合的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Numerical investigation of grade change in two strand slab caster tundish during ladle changeover in continuous casting steelmaking process has been carried out using educational version of CFD software PHOENICS. Intermixed amount was first found out for bare tundish. Further, dams and weirs were introduced to see its effect on the intermixed amount as compared to that from bare tundish. Different grade specifications were adopted for the calculation of intermixed amount in terms of time for which the intermixed grades as per the specification were exiting through the outlet. While the intermixed length was seen to decrease with dam the placement of dam in the tundish, no significant improvement in terms of decrease in the intermixed length was observed with the use of weirs in the tundish.
机译:使用教育版的CFD软件PHOENICS,对连续铸造炼钢过程中钢包转换过程中两线坯铸坯中间包的品位变化进行了数值研究。最初发现中间包量为裸包中间包。此外,引入水坝和堰,以观察其对混合量的影响(与来自裸包中间包的影响相比)。根据混合规格从出口流出的时间,采用了不同等级规格来计算混合量。虽然看到混合长度随坝的减少而减小,但在中间包中坝的位置却没有发现在堰上使用堰时混合长度减小的显着改善。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号