...
首页> 外文期刊>Mineral Planning >Tidal lagoon plans show need to address aggregates supply
【24h】

Tidal lagoon plans show need to address aggregates supply

机译:

获取原文
获取原文并翻译 | 示例
           

摘要

In December 2016 the Mineral Products Association (MPA) published its fifth Annual Mineral Planning Survey (AMPS), covering the period to the end of 20l5.The survey found that, although sand and gravel reserves consented in 2015 exceeded annual sales for the first time since 2004, demand continues to outstrip the amount of new reserves being permitted, with the ten-year average for replenishment of land-won sand and gravel remaining low at 61.

著录项

  • 来源
    《Mineral Planning》 |2017年第169期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类 矿物学;
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号