...
首页> 外文期刊>Pipeline & Gas Journal >Williams Places Phase II of Hillabee Expansion in Service
【24h】

Williams Places Phase II of Hillabee Expansion in Service

机译:

获取原文
获取原文并翻译 | 示例
           

摘要

Williams said placed Phase II of the Hillabee expansion project in service, adding natural gas capacity to the Transco system and direct access to Florida's rapidly growing power generation market. This incremental expansion of Williams' existing Transco pipeline provides firm capacity to Sabal Trail Transmission via a capacity lease arrangement. The Hillabee expansion includes construction of eight new pipe sections (loops) and a new compressor facility in Choctaw County, Ala., as well as making modifications to other existing compressor stations and valve sites. The pipeline loops vary in length and parallel the existing Transco pipeline, adjacent to the existing utility corridor.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号