【24h】

China clay

机译:瓷土

获取原文
获取原文并翻译 | 示例
           

摘要

In March Cornwall CC approved proposed extraction of china clay, partial backfilling with china clay waste with restoration to a water storage reservoir, at Higher Moor, Cocksbarrow, St Austell by Imerys Minerals Ltd. The application, although not considered to be EIA development, contained detailed planning assessments in respect of landscape and visual issues, ecology, noise, dust and blasting, hydrology, hydrogeology and archaeology. During 2003 Imerys Minerals Ltd excavated ground at Higher Moor within the Gunheath Operational Area, in order to create a new water storage facility. The clay recovered from the excavation was of good quality and formed part of a proven larger deposit extending northwards towards Hensbarrow Downs; the company wished to exploit this clay resource.
机译:3月,康沃尔郡委员会批准了提议的瓷土的提取,由瓷土废料进行部分回填并恢复至储水库的措施,该工程由Imerys Minerals Ltd.在圣奥斯特尔的Cocksbarrow较高的高沼地进行。在景观和视觉问题,生态,噪声,灰尘和爆破,水文,水文地质和考古方面进行详细的规划评估。 2003年,Imerys Minerals Ltd在Gunheath操作区域内的High Moor开挖地面,以建立新的储水设施。从开挖中回收的粘土质量良好,是已探明的较大沉积物的一部分,该沉积物向北延伸至Hensbarrow Downs。该公司希望开发这种粘土资源。

著录项

  • 来源
    《Mineral Planning》 |2006年第107期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号