【24h】

Coal

机译:煤炭

获取原文
获取原文并翻译 | 示例
           

摘要

In March Northumberland CC noted a revised planning application for the extraction of coal, fireclay and brickshales by opencast methods and auger mining with restoration to a landform park, agriculture, woodland and wetland areas at Shotton, Seaton Burn, by H J Banks & Co Ltd. It was resolved to visit the site and to hold a further public meeting. The previous proposal was reported in Mineral Planning 103 (p.52); this had attracted objections from consultees, and in response to publicity, 542 letters of support and 179 letters of objection together with 2,634 standard letters of objection and petitions in support containing 53 signatures.
机译:3月,诺森伯兰郡委员会注意到修订的计划申请,该申请书是由HJ Banks&Co Ltd.通过露天开采法和螺旋钻开采法开采煤炭,粘土和砖页岩,并将其恢复到Seaton Burn州Shotton的地貌公园,农业,林地和湿地地区。决定访问该站点并举行进一步的公开会议。先前的建议已在《矿物计划》 103中报告(第52页);这引起了被咨询人的反对,并通过宣传,提供了542份支持书和179份反对书,以及2,634份标准反对书和请愿书,其中包含53个签名。

著录项

  • 来源
    《Mineral Planning》 |2006年第107期|共6页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号