The Vale of Glamorgan County Borough Council has determined updated conditions in the first periodic review of an IDO permission that was the subject of an initial review in 1993-The proposed scheme of working envisaged the removal of the remaining reserves, estimated at 200,000 tonnes, from the upper two northern benches in two phases over three to four years.The council noted that the IDO permission covered only 3.5ha of an 8.2ha site and, therefore, the scope for environmental improvements was limited.The quarry faces were very close to the perimeter on all sides and there would be a deep body of water over much of the site when pumping stopped so that restoration choices were limited.The consultation responses and the lack of public response indicated to the council that the environmental impact was minimal The applicant submitted schedule of conditions that followed closely the conditions that had been in force since 1993 and the council considered these to be acceptable with the exception of the condition on blasting.The applicant proposed a maximum charge of 90kg but the council instead imposed a condition to ensure regular monitoring and to meet the requirements of guidance in MTAN1 in respect of vibration levels at sensitive properties.
机译:格拉摩根县自治市镇理事会在对IDO许可进行的第一次定期审核中确定了更新的条件,该条件是1993年进行的首次审核。拟议的工作计划设想从大约200,000吨的剩余储量中移除理事会在三到四年内分两个阶段在北部的两个上层长凳上工作。理事会注意到IDO许可仅覆盖了8.2公顷场地中的3.5公顷,因此,环境改善的范围是有限的。四周都有边界,泵送停止后,该地点的大部分地方都会有深水,因此恢复选择受到限制。咨询回应和公众缺乏回应向理事会表明,对环境的影响很小申请人提交严格遵循自1993年以来生效的条件的时间表,理事会认为这些条件可以接受,除爆破条件外,申请人提出了最大充电量90kg的建议,但市议会改为施加条件,以确保定期监控并满足MTAN1中有关敏感特性的振动水平的指导要求。

著录项

  • 来源
    《Mineral Planning》 |2010年第127期|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号