...
首页> 外文期刊>Mineral Planning >Tackling the dam problem
【24h】

Tackling the dam problem

机译:解决大坝问题

获取原文
获取原文并翻译 | 示例
           

摘要

It is a sobering reality that every year there are one or two significant tailings dam failures worldwide. In many cases these have been attributed to poor water management, design or construction. Extreme natural events related to 'unpredictable' climate and geology, such as floods and earthquakes, add to the complexity of these failures.The financial liability can be huge. Recent direct physical costs have been anything from $30m to $100m, while environmental liabilities and clean-up costs can run into hundreds of millions. On top of this are financial liabilities including loss of productivity and shareholder value.
机译:令人震惊的现实是,全世界每年都有一到两个重大的尾矿坝溃坝。在许多情况下,这归因于水资源管理,设计或建设不善。与“不可预测的”气候和地质有关的极端自然事件,例如洪水和地震,增加了这些失败的复杂性。财务责任可能是巨大的。最近的直接实物成本从3000万美元到1亿美元不等,而环境负债和清洁成本可能高达数亿美元。最重要的是金融负债,包括生产力损失和股东价值损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号