...
首页> 外文期刊>Mineral Planning >Industrial minerals
【24h】

Industrial minerals

机译:工业矿物

获取原文
获取原文并翻译 | 示例
           

摘要

Flintshire County Council has approved a retrospective application for a ready mixed concrete batching plant and ancillary facilities to supply substantial volumes of concrete to the ongoing redevelopment works being undertaken at the prestigious Airbus Aircraft Factory, Broughton. The site comprised 0.42ha vacant land within an industrial estate situated 2km east of the factory. The contract required supply from a dedicated source and there were no suitable alternative sites near the end user. The plant was of an open modular design comprising three 15m high cement silos, mixing tank and loading shovel, water tank, conveyors and a Portakabin, in total taking up a floor area of 33m by 11m. An open storage area for aggregates was located to the south of the site. There was significant public opposition but the council thought that noise and dust impact could be regulated by condition and that highway and visual impact would not be detrimental.lt took account of the fact that the development would have a limited duration until the end of 2009 and also the economic importance of the Airbus development to the North Wales and North West region.
机译:弗林特郡县议会已批准一项回顾性申请,要求建立一个预拌混凝土配料厂和辅助设施,以向著名的布劳顿空客飞机厂正在进行的改建工程供应大量混凝土。该厂址位于工厂以东2公里处的一个工业园区内,占地0.42公顷。合同需要从专门的来源进行供应,最终用户附近没有合适的替代场所。该工厂采用开放式模块化设计,包括三个15m高的水泥筒仓,搅拌罐和装载铲,水箱,输送机和Portakabin,总占地面积为33m x 11m。该地点的南部有一个开放的骨料存放区。公众强烈反对,但理事会认为噪音和灰尘的影响可以有条件地加以控制,高速公路和视觉的影响不会受到损害。考虑到这一发展的持续时间有限,直到2009年底,以及空客发展对北威尔士和西北地区的经济重要性。

著录项

  • 来源
    《Mineral Planning》 |2009年第124期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号