Under the Energy Bill, operators of new nuclear power stations must produce a Funded Decommissioning Programme for approval, which consists of two parts: a Decommissioning and Waste Management Plan and a Funding Arrangements Plan. In February draft guidance set out how clauses in the Energy Bill requiring operators of new nuclear power stations to meet the full cost of decommissioning and their full share of waste management costs would work. Companies would be required to demonstrate detailed and costed plans for decommissioning, waste management and disposal, before they even begin construction of a nuclear power station; set money aside into a secure and independent fund from day one of generating electricity; and have additional security in place to supplement the Fund should it be insufficient, for example, if the power station closes early. In ensuring these safeguards, the Secretary of State will draw on expert advice from the soon to be established Nuclear Liabilities Financing Assurance Board.
机译:根据《能源法案》,新核电站的运营商必须制定供资退役计划以供批准,该计划包括两个部分:《退役和废物管理计划》以及《供资安排计划》。 2月,指导草案确定了《能源法案》中要求新核电站运营商支付全部退役费用和全部废物管理费用份额的条款如何生效。在开始建造核电站之前,将要求公司展示详细的,成本估算的退役,废物管理和处置计划;从发电的第一天起,将钱存入安全独立的基金中;并有足够的安全性来补充资金,如果资金不足的话(例如,如果电站提前关闭)。为了确保这些保障措施,国务卿将借鉴即将成立的核债务融资保证委员会的专家意见。

著录项

  • 来源
    《Mineral Planning》 |2008年第116期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号