...
首页> 外文期刊>Mineral Planning >Passenham Quarry
【24h】

Passenham Quarry

机译:帕森纳姆采石场

获取原文
获取原文并翻译 | 示例
           

摘要

Three planning applications by RMC Aggregates relating to continuation and/or extension of minerals operations at Passenham Quarry were considered by Northamptonshire CC in April. The fist sought the modification of two conditions to allow for the continuation of extraction beyond the current expiry date of 18 May 2003, and for a variation of the phasing. This is directly linked to an application submitted to Milton Keynes Council for sand and gravel extraction on land to the east of the River Great Ouse. It was proposed that the extension area in Milton Keynes be accessed from Northamptonshire via an extension of the existing haul road and the provision of bailey bridges over the river. The processing plant, to which material would be brought back by dumper truck, would remain in Northamptonshire. It would take a further 12 years to complete the workings at the combined site and it was sought to extend the end date to May 2014. The site was originally permitted on appeal (see Mineral Planning Appeals in Great Britain 1992 p. 86). There were objections from Parish Councils, the Environment Agency, Stony Stratford Town Council, CPRE, and Friends of Passenham. Some 25 individual letters of objection were received from residents of Passenham and the nearby Stony Stratford area. Northamptonshire CC noted that no decision had been made by Milton Keynes Council but that the site was not included in the Milton Keynes Minerals Local Plan 2001-2011 Deposit Version (February 2003) and was therefore considered to be premature and should be refused.
机译:北安普敦郡CC于4月份审议了RMC聚合公司有关Passenham Quarry矿产运营的继续和/或扩展的三个计划申请。第一个拳头试图修改两个条件,以允许在当前的2003年5月18日的有效期之后继续进行提取,并改变了阶段。这与提交给米尔顿·凯恩斯委员会(Milton Keynes Council)的关于在大乌斯河(River Great Ouse)以东的土地上的沙子和砾石开采的申请直接相关。提议通过扩建现有运输道路和在河上设置贝利桥,从北安普敦郡进入米尔顿凯恩斯的扩展区。加工厂将通过自卸车将物料运回北安普敦郡。完成合并站点的工作还需要再花费12年的时间,因此寻求将结束日期延长至2014年5月。该站点最初被允许上诉(请参见1992年英国《矿物规划上诉》,第86页)。教区议会,环境局,斯托尼·斯特拉特福德镇议会,CPRE和帕森纳姆之友表示反对。帕森纳姆(Passenham)和附近的斯托尼·斯特拉特福德地区(Stony Stratford)地区的居民收到了大约25份反对书。北安普敦郡CC指出,米尔顿·凯恩斯理事会尚未做出任何决定,但该地点未列入《米尔顿·凯恩斯矿产本地计划2001-2011矿床版本(2003年2月)》,因此被认为为时过早,应予以拒绝。

著录项

  • 来源
    《Mineral Planning》 |2003年第95期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号