【24h】

Quarry problems

机译:采石场问题

获取原文
获取原文并翻译 | 示例
           

摘要

A report on current development control issues at the Cridling Stubbs Quarry and Landfill Complex was considered in March by North Yorkshire CC. and a site visit held. The site is operated by Darrington Quarries Ltd and Waste Recycling Group plc. Members requested the report following receipt of complaints about various activities at the site.Magnesian limestone is currently being worked in two separate areas, Darrington East and Cridling Stubbs South. Working in Darrington East commenced in early 2001 using a hydraulic pecker and hydraulic excavator; stone is transported to the processing plant by lorry along the public highway. Mineral extraction is expected to continue in this area for a further three years. The Cridling Stubbs South site was first permitted by Wakefield MDC and transferred into North Yorkshire following boundary changes in 1993. Mineral extraction in this area commenced in the late 1990s. Permission for restoration of the mineral workings by landfill exists over the large majority of the site. The main mineral processing plant is remote from the current extraction areas.
机译:北约克郡CC于3月审议了关于立桩采石场和垃圾填埋场当前发展控制问题的报告。并进行了实地考察。该站点由Darrington Quarries Ltd和Waste Recycling Group plc运营。成员收到关于该场地各种活动的投诉后要求提供报告。目前,镁质石灰石正在两个独立的地区(东达灵顿和南克里德林斯图布斯)进行工作。 2001年初,在达灵顿东部开始使用液压啄木器和液压挖掘机进行工作。石头沿着公共公路被卡车运到加工厂。预计该地区的矿物开采将继续进行三年。早在1993年边界变更后,Wakefield MDC首次允许Criddling Stubbs South场址转移到北约克郡。该地区的矿产开采始于1990年代后期。大部分场地都存在通过垃圾填埋场恢复矿物加工的许可。主要的矿物加工厂远离当前的开采区。

著录项

  • 来源
    《Mineral Planning》 |2002年第91期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号