...
【24h】

Enforcement

机译:执法

获取原文
获取原文并翻译 | 示例
           

摘要

In January Bedfordshire CC was recommended that Enforcement Action be taken at Arlesey Bridge Meadows where in October it had considered an application to vary a condition attached to the permission for the borrow pit to enable the stockpiled mineral to be removed and used for purposes other than for the Arlesey Bridge/A507 road contract. In November, topsoil was removed and not used on the bridge works. It was deemed expedient to issue a Stop Notice and an Enforcement Notice to ensure that further removal of material did not take place. The original proposal was reported in Mineral Planning 91 (p.49). In January enforcement action was recommended to require the refilling of a lake with the stockpiled material and the restoration of the land to agriculture. Any remaining mineral could then be permitted to leave the site for use for other purposes.
机译:1月,贝德福德郡CC建议在Arlesey Bridge Meadows采取执法行动,该地方在10月份考虑了一项申请,以改变借用坑许可所附带的条件,以使所储存的矿物能够被去除并用于除其他目的之外的其他用途。 Arlesey Bridge / A507道路合同。 11月,表土被去除,没有在桥梁工程上使用。发出停止通知和执行通知被认为是适当的,以确保不会进一步清除材料。最初的建议已在《矿产计划》 91中报告(第49页)。一月份,建议采取执法行动,要求用储存的材料重新填充湖泊,并恢复土地用于农业。然后可以允许任何剩余的矿物离开场地以用于其他目的。

著录项

  • 来源
    《Mineral Planning》 |2003年第94期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号