...
【24h】

Enforcement

机译:执法

获取原文
获取原文并翻译 | 示例
           

摘要

In March North Yorkshire CC examined current issues at Cridling Stubbs Quarry following earlier problems (see Mineral Planning 92 p. 13). Counsel's opinion on the potential to take enforcement action against use of the pecker within the Darrington East area had been received. In Counsel's opinion, use of the pecker constituted a breach of the planning condition requiring the development to be carried out in accordance with the application details. However, Counsel set out a number of reasons why it may not be expedient to take action including the absence of any specific recorded breach of the noise limit condition, the attempts made by the operator to limit disturbance, the potential consequences, in terms of possible closure of the quarry and associated loss of jobs, and the potential for a successful challenge to any enforcement action.
机译:3月,北约克郡议会在先前的问题之后检查了Cridling Stubbs采石场的当前问题(请参阅《矿物规划》第92页第13页)。收到了律师关于在达灵顿东部地区采取行动打击使用啄木鸟的潜力的意见。 Counsel认为,使用啄木鸟违反了计划条件,要求根据申请细节进行开发。但是,法律顾问列出了许多可能导致不方便采取措施的原因,包括没有明确记录到的任何违反噪音限制条件的规定,操作员为限制干扰而进行的尝试,可能的后果等。采石场的关闭以及相关的工作损失,以及对任何执法行动的成功挑战的可能性。

著录项

  • 来源
    《Mineral Planning》 |2003年第95期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号