...
首页> 外文期刊>精密工学会誌 >Optimal After-Service Strategy of the Infrastructure Equipment (2nd Report)
【24h】

Optimal After-Service Strategy of the Infrastructure Equipment (2nd Report)

机译:

获取原文
获取原文并翻译 | 示例
           

摘要

The purpose of this paper is to properly plan the preventive maintenance schedules of multi elevators and optimize the number f maintenance personnel so as to minimize the total cost of the maintenance cost composed of labor cost and parts cost, and the quality cost, namely the loss to be incurred when an elevator breaks down. The method is presented to compose the optimal preventive maintenance schedules on a long-term basis by rescheduling the contents of schedules dynamically and flexibly in accordance with ever-changing maintenance conditions, with taking the possibility of the future failure occurrence into consideration. From numerical experiments, the validity of the presented procedure for planning the preventive maintenance schedules and the effectiveness of considering the possibility of the future failure occurrence in planning the schedules are shown, and the optimal number of maintenance personnel can be determined.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号