首页> 外军国防科技报告 >Simulations of the 100kW TJNAF FEL using a step-tapered undulator
【2h】

Simulations of the 100kW TJNAF FEL using a step-tapered undulator

机译:使用步进锥形波荡器对100kW TJNAF FEL的仿真

代理获取
代理获取并翻译 | 示例

摘要

The Thomas Jefferson National Accelerator Facility (TJNAF) free electron laser (FEL) can be upgraded to operate at 100 kW average power in the near future using a configuration that recirculates the electron beam to recover energy. It is important to extract the maximum energy from the electron beam in a pass through the undulator while inducing the minimum amount of exhaust energy spread. A larger energy extraction reduces the requirement for a large recirculating current, while a smaller exhaust energy spread allows the intense electron beam to be recirculated without damaging components. To improve FEL performance, we explore the use of the step-tapered undulator, which alters the resonance condition halfway through the undulator. Short pulses complicate the desired interaction. Comparisons are made to the conventional periodic and linearly-tapered undulators.

著录项

  • 作者

    Blau, J.;

  • 作者单位
  • 年(卷),期 2020(),
  • 年度 2020
  • 页码
  • 总页数 5
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 网站名称 美国海军研究生院图书馆
  • 栏目名称 所有文件
  • 关键词

代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号