Reconnaissance Report, Local Study Cost Sharing Agreement, Shore Protection AndErosion Control Project; Nantasket Beach Shore Protection Study Hull, Massachusetts

机译:侦察报告,地方研究费用分摊协议,岸上保护和侵蚀控制项目; Nantasket海滩岸边保护研究马萨诸塞州赫尔

获取原文

摘要

The purpose of this reconnaissance study is to determine whether further planningto alleviate the storm damages in the study area is in the Federal interest. During the Halloween Storm of October 30-31, 1991, the concrete sea walls along the Metropolitan District Commission Nantasket Beach Reservation in Hull, Massachusetts, experienced a substantial amount of damage and undermining. In addition, a large volume of beach material seaward of the walls was also lost. Most past damages have occurred to the existing concrete sea walls including the ramps, stairs, walkouts, riprap and sidewalks as well as backshore flooding due to wave action and overtopping. Total costs for plan is $4,220,000 and total annual charges is $383,000. The average annual benefits from damages prevented, estimated at $2,737,200. The benefit to cost ratio is 7 to 1. The reconnaissance report demonstrates that a sand fill protection plan at Nantasket Beach is environmentally,. economically, and technically feasible and includes that further planning to alleviate shore damages and flooding are in the Federal interest.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号