首页> 美国政府科技报告 >Effect of the Covariance Factor on the Procurement Problem Variance of Net Leadtime Demand
【24h】

Effect of the Covariance Factor on the Procurement Problem Variance of Net Leadtime Demand

机译:协方差因子对净交货期需求采购问题变动的影响

获取原文

摘要

An analysis is made of the formulae used by the Navy's Inventory Control Points in calculating the variance of Net Leadtime Demand of repairable items. A new formula is then derived, which makes use of actual calculations of covariance between regenerations and demands. The resulting variance values derived from the new formula are compared with the variance values resident on the Navy's Ships Parts Control Center data base and are shown to produce lower variances. The new formula is also compared to the option path formula to determine which formula produces the smallest variance. The comparison suggests an under-estimation of variances results when the option path with its estimate of the covariance is used. The thesis concludes with recommendations for implementation of the new formula. Keywords: Standard deviation, Inventory models. (KR)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号