首页> 美国政府科技报告 >Final Decision Document for the Interim Response Action for the Improvement of the North Boundary System at Rocky Mountain Arsenal via Construction of Groundwater Recharge Trenches.
【24h】

Final Decision Document for the Interim Response Action for the Improvement of the North Boundary System at Rocky Mountain Arsenal via Construction of Groundwater Recharge Trenches.

机译:通过建设地下水补给沟改善落基山军火库北界系统的临时应对行动的最终决定文件。

获取原文

摘要

The Interim Response Action (IRA) for the Improvement of the North Boundary System at Rocky Mountain Arsenal (RMA) Via Construction Of Groundwater Recharge Trenches is being conducted as part of the IRA Process for RMA in accordance with the June 5, 1987 report to the court in United States v. Shell Oil Co. and the proposed Consent Decree.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号