首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams, Fitch Reservoir Dam (NH 00142), Connecticut River Basin, Claremont, New Hampshire. Phase I Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams, Fitch Reservoir Dam (NH 00142), Connecticut River Basin, Claremont, New Hampshire. Phase I Inspection Report

机译:国家非联邦大坝检查计划,惠誉水库大坝(NH 00142),康涅狄格河流域,克莱蒙特,新罕布什尔州。第一阶段检查报告

获取原文

摘要

The dam is an earth embankment, about 300 ft. long and 40 ft. high, with a 6 ft. wide channel spillway. Lives in the houses would be threatened by a dam failure. It is intermediate in size with a high hazard category. The test flood for the dam is the PMF. The dam is in fair condition at the present time. Further investigations are recommended to evaluate the adequacy of the spillway and the stability of the downstream slope. (Author)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号