Stability of Rubble-Mound Breakwater, Jubail Harbor,Saudi-Arabia;Hydraulic Model Investigation.

机译:沙特阿拉伯朱拜勒港防波堤防波堤的稳定性;水力模型研究。

获取原文

摘要

An undistorted-scale hydraulic model study was conducted to investigate the adequacy of seven breakwater cross sections considered for use at Jubail Harbor, Saudi Arabia. Tests conducted in evaluating the various plans consisted of (a) two-dimensional stability tests (Plans 1, 2, 2A, 3, 4, and 5), (b) two-dimensional transmission tests (Plan 1, 2, 3, and 5), and (c) three-dimensional stability tests (Plan 6). Test results indicate that for the selected design conditions 5.0-metric-ton dolos armor will be of adquate size for use on all portions of the Jubail breakwater system. (Author)