首页> 美国政府科技报告 >DDC-10 Year Requirements and Planning Study. Expert Panel Review Report.
【24h】

DDC-10 Year Requirements and Planning Study. Expert Panel Review Report.

机译:DDC-10年度要求和规划研究。专家小组审查报告。

获取原文

摘要

An evaluation by expert panels was performed as a phase of an overall study to develop technical objectives for DDC planning in the 1978-1988 time period. The approach taken was a modified composite of two approaches: (1) The SEER (System for Event Evaluation and Review) approach used by the Naval Supply Systems Command, and (2) the Probe 2 methodology of the TRW Corporation. This composite methodology consists of four steps: (1) development of an events list derived from a literature survey and an interagency survey, (2) evaluation of the events list by experts involved in information transfer at the systems level, (3) modification of the events list based on the first evaluation, and reevaluation of the list by a second panel of experts in information technology at the agency level concerned with long range planning and development, and (4) analysis of results, definition of the state of the art and probable time phasing of the events evaluated as desirable and feasible. Illustrations are presented summarizing the concensus of the evaluation and probable timing by importance of the event, and goals for accomplishment. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号