首页> 美国政府科技报告 >Project Trinidad:Explosive Excavation of Railroad Cuts 2and 3by Mounding and Directed Blasting.
【24h】

Project Trinidad:Explosive Excavation of Railroad Cuts 2and 3by Mounding and Directed Blasting.

机译:特立尼达项目:铁路爆破开挖2和3通过夯实和定向爆破。

获取原文

摘要

The report summarizes the objectives,design,and results of two explosive excavation experiments performed as the final phase of Project Trinidad, a comprehensive series of tests to determine the cratering properties of interbedded sandstones and shales. The experiments were performed in September 1971by the U.S. Army Engineering Waterways Experiment Station Explosive Excavation Research Laboratory. These final experiments were designed to excavate through-cuts for relocation of the Colorado and Wyoming Railroad at the Trinidad Dam and Lake Project. The first of the two experiments tested a charge array designed to break up material within a 19,000-cubic yards cut to facilitate later removal of the material by mechanical means. The concept tested was mounding, a blasting technique in which charges are positioned with respect to the horizontal ground surface rather than a vertical bench face. (Modified author abstract)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号