首页> 美国政府科技报告 >Expedient Surfacing and Drainage of Roads, Streets, and Parking and Storage Areas in Theater of Operations. Report 2. Tests Conducted Between August 1968 and July 1969
【24h】

Expedient Surfacing and Drainage of Roads, Streets, and Parking and Storage Areas in Theater of Operations. Report 2. Tests Conducted Between August 1968 and July 1969

机译:运营剧院道路,街道,停车场和储存区的便利堆焊和排水。报告2. 1968年8月至1969年7月期间进行的测试

获取原文

摘要

Engineering tests were conducted on a test road covered with an asphalt-impregnated polypropylene membrane to determine the effectiveness of the combined materials as a dustproof, waterproof wearing surface over adequate-strength subgrades and as an encasing membrane used to form a membrane- enveloped soil layer (MESL) in areas where high water tables exist. The polypropylene- asphalt membrane was installed on the test road, exposed to varying climatological conditions prevalent in the Vicksburg area, and subjected to mixed pneumatic-tired traffic of military vehicles. Vehicles used for testing were a 2-1/2 ton, 6 x 6 cargo or dump truck and a 5-ton, 6 x 6 cargo or dump truck, both carrying maximum off-highway loads and having appropriate tire pressures. It was concluded from the test results that polypropylene-asphalt membrane will furnish a waterproof, dustproof wearing surface to any otherwise satisfactory subgrade for periods in excess of 2 years and will sustain many thousands of repetitions of pneumatic-tired convoy traffic without suffering significant damage, and MESL CONSTRUCTION IS EFFECTIVE IN PROVIDING A STABLE ROADWAY IN AREAS HAVING POOR DRAINAGE AND HIGH WATER TABLES. (Author, modified-PL)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号