首页> 美国政府科技报告 >Qudas Power Plant Turbine Restoration Project and Qudas Power Plant Expansion Project Baghdad, Iraq. Project and Sustainment Assessment
【24h】

Qudas Power Plant Turbine Restoration Project and Qudas Power Plant Expansion Project Baghdad, Iraq. Project and Sustainment Assessment

机译:Qudas电厂汽轮机修复项目和Qudas电厂扩建项目伊拉克巴格达。项目和维持评估

获取原文

摘要

Introduction. These project assessments were initiated as part of the Special Inspector General for Iraq Reconstruction's continuing assessments of selected reconstruction activities funded by the Iraq Relief and Reconstruction Fund. The objective of the Qudas Power Plant Turbine Restoration (SIGIR PA-07-101) project included requirements to inspect, evaluate, restore, convert to crude-oil firing, and start up two General Electric Frame 9E combustion gas turbine units. In addition, the turbine unit restoration project included requirements to evaluate, restore, commission, and turn over four General Electric LM-6000 units. The Qudas Power Plant Expansion (SIGIR PA-07- 104) project provided for the design, manufacturing, delivery to the site and off-loading, erection, painting, commissioning, start-up, testing, and turn over of two new General Electric Frame 9E open-cycle gas turbine units. Assessment Objectives. The overall objective of these assessments was to provide timely relief and reconstruction project information to interested parties to enable appropriate action, when warranted.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号