首页> 美国政府科技报告 >Environmental Assessment, Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06). Volume 1, Beale Air Force Base, California.
【24h】

Environmental Assessment, Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06). Volume 1, Beale Air Force Base, California.

机译:环境评估,永基础设施发展展望(WINDO)实施计划(04-06财年)。第1卷,加利福尼亚比尔空军基地。

获取原文

摘要

The purpose of the WINDO Implementation Plan at Beale AFB is to improve the facility planning process, capture the Wing Commander s vision of what infrastructure improvements are necessary to support the base s on-going mission, and link the Base General Plan to individual funding programs such as Military Construction (MILCON); Operations and Maintenance (O&M), Sustainment, Restoration, and Modernization for Contract (SRMC); Environmental Restoration Account (ERA); Defense Energy Systems Command (DESC); Anti-Terrorism/Force Protection (AT/FP); Quality of Life (QOL), Army & Air Force Exchange Service (AAFES),and other programs to provide a solid plan that both the base and Air Combat Command (ACC) agree upon and understand. The objective of this Environmental Assessment (EA) is to disclose and analyze potentially significant environmental impacts expected from implementation of Beale AFB s WINDO Implementation Plan and development projects and long-term mission-based actions which comprise the plan (the Proposed Action). A secondary objective of this EA is to determine the potential cumulative impacts from Beale AFB s mission base-wide.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号