首页> 美国政府科技报告 >JTAGG II Brush Seal Test Results
【24h】

JTAGG II Brush Seal Test Results

机译:JTaGG II刷式密封测试结果

获取原文

摘要

The Tri-services JTAGG II engine uses two identical brush seals, in tandem,located aft of the high pressure compressor. The engine operating conditions, at intermediate rated power (IRP), for this seal are estimated to be 50,000 rpm (899 ft/sec) speed, 175 psid air to air pressure differential and 1200 deg F air temperature. The testing was comprised of static air leakage, performance, seal offset, rotor run out tests and a 50 hr endurance test in the NASA Lewis seal rig. Based on the test results, it is concluded that the brush seal design should be able to meet the air leakage flow factor goal of less than 0.004 for the engine IRP operating conditions. As a comparison, a labyrinth seal in this location with a 0.005 in. typical radial clearance has an estimated leakage flow factor of 0.007. The long term seal life can not be predicted accurately due to the limited endurance testing of 50 hr. However, based on the excellent condition of the test seal and rotor after 50 hr of testing, it is anticipated that the seals should easily meet the JTAGG II engine test requirement.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号