首页> 美国政府科技报告 >Remedial action plan and site design for stabilization of the inactive Uranium Mill Tailings Site at Lowman, Idaho: Attachment 1, Specifications and design drawings, LOW; Subcontract Documents: Bid schedule, special conditions, specifications, subcontract drawings. Final design for construction, Appendix B of the Cooperative Agreement
【24h】

Remedial action plan and site design for stabilization of the inactive Uranium Mill Tailings Site at Lowman, Idaho: Attachment 1, Specifications and design drawings, LOW; Subcontract Documents: Bid schedule, special conditions, specifications, subcontract drawings. Final design for construction, Appendix B of the Cooperative Agreement

机译:用于稳定爱达荷州Lowman的非活动铀矿尾矿场地的补救行动计划和场地设计:附件1,规格和设计图纸,LOW;分包合同文件:投标时间表,特殊条件,规格,分包合同图纸。施工的最终设计,合作协议的附录B.

获取原文

摘要

This volume contains subcontract documents which include: bidding requirements; terms and conditions; specifications; and subcontract drawings.

著录项

  • 作者

  • 作者单位
  • 年度 1991
  • 页码 1-186
  • 总页数 186
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

    EDB/054000; EDB/540250;

    机译:EDB / 054000; EDB / 540250;

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号