首页> 美国政府科技报告 >Installation and evaluation of a nuclear power plant operator advisor based on artificial intelligence technology. Interim progress report and second year development plan
【24h】

Installation and evaluation of a nuclear power plant operator advisor based on artificial intelligence technology. Interim progress report and second year development plan

机译:安装和评估基于人工智能技术的核电厂操作员顾问。中期进度报告和第二年发展计划

获取原文

摘要

This report discusses the following topics on a Nuclear Power Plant operator advisor based on artificial Intelligence Technology; Workstation conversion; Software Conversion; V&V Program Development Development; Simulator Interface Development; Knowledge Base Expansion; Dynamic Testing; Database Conversion; Installation at the Perry Simulator; Evaluation of Operator Interaction; Design of Man-Machine Interface; and Design of Maintenance Facility.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号