首页> 美国政府科技报告 >Nuclear Unit Operating Experience:1985-1986nUpdate
【24h】

Nuclear Unit Operating Experience:1985-1986nUpdate

机译:核电机组运行经验:1985-1986n更新

获取原文

摘要

This report presents results of a project conducted by the S.M. Stoller Corpora¬tion for EPRI. The purpose of the project was to analyze the operational experi¬ence of nuclear units within the United States during the calendar years 1985 through 1986 using the Operating Plant Evaluation Code (OPEC-2) System and other available sources of operational data.nThe report updates and supplements previous EPRI reports NP-1191, NP-2092, NP-3480, and NP-4368. The overall performances of U.S. nuclear units and the availability and capacity factor losses for the constituent systems and components are presented. The problem areas which have impacted most significantly on nuclear unit performance during 1985 to 1986 are discussed in detail. Forced outage rates and scram rates are also investigated. The 92 domestic nuclear units which were considered in this report include all units which are rated 400 MW(e) or greater. Three Mile Island 2 was excluded from all analyses of this report. The performances of BWRs and PWRs in the United States during 1985 through 1986 were compared with similar units operating in foreign countries.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号