首页> 美国政府科技报告 >Supporting Data and Calculations for the NNWSI (Nevada Nuclear Waste Storage Investigations) Project Information Management System Concepts Evaluation Report
【24h】

Supporting Data and Calculations for the NNWSI (Nevada Nuclear Waste Storage Investigations) Project Information Management System Concepts Evaluation Report

机译:支持NNWsI(内华达核废料储存调查)项目信息管理系统概念评估报告的数据和计算

获取原文

摘要

This report presents the supporting data and calculations that provided the basis for the NNWSI Project Information Management System Concepts Evaluation Report. Project documentation estimates for numbers of documents and pages are presented for all nine Project participants. These estimates cover the time period from 1980 to 1990. In addition, the report presents a calculational method for estimating document and page volumes beyond the year 1990. Electronic character code and bit-mapped image storage requirements associated with the page volumes are also shown and the calculational method described. Six conceptual system approaches capable of satisfying NNWSI Project requirements are defined and described. These approaches include: fully centralized microfilm system based on computer-assisted retrieval (CAR) (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical disk system based on electronic image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). All assumptions associated with these approaches are given. Data sheets in an appendix describe the capital equipment and labor components that were used as the basis of the cost evaluation. Definitions of two cost scenarios cover: (1) processing of all documents and pages and (2) processing of 10% of the total documents and 30% of the total pages. Capital equipment, labor, and summary cost tables for the years from 1987 through 1991 are presented for both scenarios. The report also describes a case for starting system operations in 1988 instead of 1987 and complete cost tables for the 1988 start-up case are given. 1 ref. (ERA citation 12:028249)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号