Labor Productivity Adjustment Factors: A Method for Estimating Labor Construction Costs Associated with Physical Modifications to Nuclear Power Plants.

机译:劳动生产率调整因素:估算与核电厂物理改造相关的劳动力建设成本的方法。

获取原文

摘要

NRC regulatory impact analyses (RIA's) address the costs and benefits associated with proposed regulatory requirements. Many of these requirements will result in physical modification to existing structures and systems at nuclear power plants. The report develops quantitative labor productivity adjustment factors for the performance of RIA's. These factors will allow analysts to modify 'new construction' labor costs to account for changes in labor productivity due to differing work environments at operating reactors and at reactors with construction in progress. The technique developed in the paper relies on the Energy Economic Data Base (EEDB) for baseline estimates of the direct labor hours and/or labor costs required to perform specific tasks in a new construction environment. The labor productivity cost factors adjust for constraining conditions such as working in a radiation environment, poor access, congestion and interference, etc., which typically occur on construction tasks at operating reactors and can occur under certain circumstances at reactors under construction. While the results do not portray all aspects of labor productivity, they encompass the major work place conditions generally discernable by the NRC analysts and assign values that appear to be reasonable within the context of industry experience.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号