首页> 美国政府科技报告 >TMI-1 Restart: An Evaluation of the RHR (Rohrer, Hibler and Replogle, Inc.), BETA (Basic Energy Technology Associates, Inc.), and Draft INPO Reports as They Affect Restart Issues at Three Mile Island Nuclear Station Unit 1 Docket 50-289.
【24h】

TMI-1 Restart: An Evaluation of the RHR (Rohrer, Hibler and Replogle, Inc.), BETA (Basic Energy Technology Associates, Inc.), and Draft INPO Reports as They Affect Restart Issues at Three Mile Island Nuclear Station Unit 1 Docket 50-289.

机译:TmI-1重启:评估RHR(Rohrer,Hibler和Replogle,Inc。),BETa(基础能源技术协会,公司)和INpO报告草案,因为它们影响三里岛核电站1号机组的重启问题50-289。

获取原文

摘要

NRC Inspection Report 50-289/83-10, reported the results of inspection of

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号