The total project capital cost of facilities to stabilize uranium mill tailings at Elliot Lake while producing 350,000 short tons per year of sulphuric acid and 266,000 short tons per year of triple superphosphate is approximately 153 million dollars. This includes pyrite flotation, roasting, acid and phosphate production, site preparation, utilities and project overhead. A new operating credit of 20.43 dollars per short ton of acid is estimated, achieved from the sale of steam and fertilizer. Two alternatives to the above were also examined, as follows: a) Production of 596,000 short tons per year of acid, and the sale of 246,000 short tons which are in excess of the Elliot Lake mill's requirement. The capital cost of this scheme is approximately 89 million dollars, with a net operating credit of 14.97 dollars per short ton of acid. b) Production of only 350,000 short tons per year of acid. This would entail disposal of the excess pyrite floated from the Rio Algom mills. The capital cost of this scheme is approximately 75 million dollars, with an operating cost of 10.47 dollars per short ton of acid. (Atomindex citation 17:037061)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号