Defining an Optimum Pumping-Time Requirement for Sampling Ground-Water Wells on the Hanford Site

机译:确定在汉福德场地采样地下水井的最佳抽水时间要求

获取原文

摘要

The objective was to determine the optimum time period necessary to pump water from a well before a representative sample of the ground water can be obtained. It was assumed that a representative sample has been collected if the concentration of chemical parameters is the same in a number of samples taken consecutively, so that the concentration of parameters does not vary with time of collection. Ground-water samples used in this project were obtained by pumping selected wells on the Hanford Site. At each well, samples were taken at two minute intervals, and on each sample various chemical analyses were performed. Samples were checked for pH, sulfate, iron, specific conductivity, chloride, nitrate and alkalinity. The data showed that pH, alkalinity, sulfate and specific conductivity levels stabilized almost immediately after pumping of the well began. In many wells, the chloride and nitrate levels were unstable throughout the 38-minute sampling period. Iron levels, however, did not behave in either fashion. The concentration of iron in the samples was high when pumping began but dropped rapidly as pumping continued. The best explanation for this is that iron is flushed from the sides of the casing into the well when pumping begins. After several minutes of pumping, most of the dissolved iron is washed from the well casing and the iron concentration reaches a stable plateau representative of the iron concentration in the ground water.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号