首页> 美国政府科技报告 >Residual-Energy-Application Program: EAST -Facility Requirements Document
【24h】

Residual-Energy-Application Program: EAST -Facility Requirements Document

机译:剩余能源应用程序:EasT -Fility Requirements Document

获取原文

摘要

An Energy Applied Systems Test (EAST) Facility will be constructed at the Savannah River Plant to serve as the primary systems test and evaluation facility for the Department of Energy's Residual Energy Applications Program (REAP). The REAP goal is to stimulate the private sector to use available residual heat currently being dissipated. The objectives of the EAST Facility are to perform research and development on heat energy recovery and conversion equipment; establish high confidence in system performance, system availability, and system operating, maintenance, and material costs; and provide a national competence in technologies required for the installation and operation of heat recovery systems. The purpose of this document is to provide design specifications for the EAST Facility. Volume I presents an initial testing capability recommended for EAST and design specifications are provided for the physical plant and major test support systems. Five options are included for tailoring the full-up testing capability to reduce costs of the core facility. (ERA citation 06:030877)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号