首页> 美国政府科技报告 >Operation of the Submerged Demineralizer System at Three Mile Island Nuclear Station, Unit No. 2; Docket No. 50-320; Metropolitan Edison Company, Jersey Central Power and Light Company, Pennsylvania Electric Company
【24h】

Operation of the Submerged Demineralizer System at Three Mile Island Nuclear Station, Unit No. 2; Docket No. 50-320; Metropolitan Edison Company, Jersey Central Power and Light Company, Pennsylvania Electric Company

机译:二号三里岛核电站淹没式除盐系统的运行;案卷号50-320;大都会爱迪生公司,泽西中央电力和照明公司,宾夕法尼亚电气公司

获取原文

摘要

As a result of the March 28, 1979, accident at the Three Mile Island Nuclear Station, Unit 2, significant volumes of contaminated water were generated and collected in the reactor and auxiliary buildings of the plant. Several hundred thousand gallons of intermediate level waste water collected in auxiliary building tanks. Recognizing that these contaminated bodies of water must either be removed from their present locations or processed for the cleanup to proceed, Metropolitan Edison Company (the licensee) initiated the design of systems to process the intermediate and high activity waste water. The Submerged Demineralizer System (SDS) is an underwater liquid radwaste processing system, located in the 'B' spent fuel pool of the TMI-2 fuel handling building. The SDS is designed to decontaminate the high activity waste water by filtration and ion exchange. A Safety Evaluation Report related to the operation of the Submerged Demineralizer System at Three Mile Island Nuclear Station, Unit 2, located in Dauphin County, Pennsylvania, has been issued by the Office of Nuclear Reactor Regulation of the U.S. Nuclear Regulatory Commission. This Safety Evaluation Report presents the staff's analysis of information submitted by the licensee (Metropolitan Edison Company, Jersey Central Power and Light Company, and Pennsylvania Electric Company).

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号