首页> 美国政府科技报告 >Evaluation of Load-Management Systems and Devices: Technical Planning Study TPS 78-807. Final Report, June 1980
【24h】

Evaluation of Load-Management Systems and Devices: Technical Planning Study TPS 78-807. Final Report, June 1980

机译:负载管理系统和设备的评估:技术规划研究Tps 78-807。最终报告,1980年6月

获取原文

摘要

This report presents the results of a first-order evaluation of those Communication and Load Control (C and LC) and Thermal-Energy-Storage (TES) systems which have been used sufficiently to provide the minimal cost and performance data required for such a first-order evaluation. A total of five generic types of remote C and LC systems, 3 types of local control devices and 8 types of thermal storage systems are examined. A costing analysis is developed for each system or device preceded by a discussion of its technical and operational characteristics. Payback figures are derived for the thermal-storage systems based on uniform operational scenarios under two basic rate structures. The report includes preliminary conclusions as to the present and future feasibility of the various systems and recommendations for further research and development that would improve the feasibility of C and LC or TES. (ERA citation 05:032406)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号