Powerplant Productivity Improvement Study: Historic Performance of Illinois Investor-Owned Electrical-Generating Units. Final Report, Project 2, Task 1

机译:动力装置生产力改进研究:伊利诺伊州投资者拥有的电力发电机组的历史性能。最终报告,项目2,任务1

获取原文

摘要

In this task the historical performance of powerplants in Illinois was examined and the opportunities for improved powerplant productivity in Illinois was determined. The four utilities considered were the major investor-owned electric generating utilities in Illinois, i.e., Central Illinois Light Co., (CILCO), Central Illinois Public Service (CIPS), Commonwealth Edison (CECO), and Illinois Power (IP). The major findings are: (1) for evaluation purposes, the equivalent availability was judged to be the most-appropriate measure; (2) in terms of powerplant productivity, IP is among the best in the nation and, in terms of productivity from large coal units, it ranks in the top five nationally; (3) in general, the performance of coal-fired units of CILCO and CECO have been below national averages and in some cases, significantly below; (4) a review of the trends in production of all Illinois units reveals that Illinois units as a group have been generally below national averages for the respective unit classes; (5) as noted in this and other studies, productivities of the nuclear plants in Illinois have been below the national average for all comparable nuclear plants; and (6) this analysis should be updated when national 1977 and 1978 Edison Electric Institute data become publicly available. (ERA citation 05:027284)

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号