首页> 美国政府科技报告 >Upgrading of St. Joseph River Hydroelectric Plants. Feasibility Assessment Report
【24h】

Upgrading of St. Joseph River Hydroelectric Plants. Feasibility Assessment Report

机译:圣约瑟夫河水电站升级改造。可行性评估报告

获取原文

摘要

The feasibility of up-grading five existing low-head hydroelectric plants on the St. Joseph River in Michigan and Indiana was studied. Evaluation of the technical, economic, legal, institutional, and environmental aspects indicate that up-grading would be beneficial in that the combined output of the plants in their existing condition, 78 million kWh, could be increased by 20 to 30%, service life of the plants would be extended by 35 to 40 years, and fuel required for thermal power plants would be saved. No adverse environmental impacts would result from this reconditioning, and no regulatory action is considered necessary in this regard. (ERA citation 05:006696)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号