首页> 美国政府科技报告 >Practical Experience with Quality Assurance and Quality Control of Instrumentation and Control Systems - the Safety Assessors View
【24h】

Practical Experience with Quality Assurance and Quality Control of Instrumentation and Control Systems - the Safety Assessors View

机译:仪表和控制系统质量保证和质量控制的实践经验 - 安全评估员观点

获取原文

摘要

The paper shows up the inital situation (approx. 1974) concerning QA and QC of I and C-Systems of the Austrian Nuclear Power Plant at Zwentendorf. The main problems were the diversity of manufacturers, QA-levels, parameters. Good communication between all involved parts (vendor, utility, safety assessors) turned out to be one of the most important prerequisites for the safety review work. Then it is exposed how the safety review work was done and some highlights are mentioned. (Atomindex citation 12:588879)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号