首页> 美国政府科技报告 >POST-CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 90: AREA 2 BITCUTTER CONTAINMENT, NEVADA TEST SITE, NEVADA FOR THE PERIOD JULY 2005- JUNE 2006
【24h】

POST-CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 90: AREA 2 BITCUTTER CONTAINMENT, NEVADA TEST SITE, NEVADA FOR THE PERIOD JULY 2005- JUNE 2006

机译:对于纠正行动单位90的封闭后检查报告:2005年7月至2006年6月期间,内华达州内华达地区的内容2区域,包括2个BITCUTTER容器

获取原文

摘要

This annual report covers the period of July 2005 to June 2006 and consists of copies of the inspection checklists, maintenance and repair records (if any), photographs, and recommendations and conclusions. The semiannual inspections for CAU 90 were performed on December 12, 2005, and June 20, 2006. The December inspection indicated continued integrity of the unit. The fencing, signs, and cover were in excellent condition. No further inspections or actions are necessary other than continuing the semiannual inspections. The June inspection also indicated continued integrity of the waste unit cover. No vegetation was noted on the cover. Some small animal burrows were backfilled during the time of the site inspection and will be watched during future inspections. The fencing, signs, and gate were in excellent condition.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号