首页> 美国政府科技报告 >Biomass reburning: modeling/engineering studies. Quarterly Report No. 8 for211 Period July 1-September 26, 1999
【24h】

Biomass reburning: modeling/engineering studies. Quarterly Report No. 8 for211 Period July 1-September 26, 1999

机译:生物质再燃:建模/工程研究。一九九九年七月一日至九月二十六日期间第二季报告第111号

获取原文

摘要

This project is designed to develop engineering and modeling tools for a family211u001eof NO(sub x)control technologies utilizing biomass as a reburning fuel. During 211u001ethe eighth reporting period (July 1--September 26, 1999), Antares Group Inc, 211u001eunder contract to Niagara Mohawk Power Corporation, evaluated the economic 211u001efeasibility of biomass reburning options for Dunkirk Station. This report 211u001eincludes summary of the findings; complete information will be submitted in the 211u001enext Quarterly Report.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号