首页> 美国政府科技报告 >Project W-314 Acceptance Test Report HNF-4643 for HNF-4642 241-AN-A Valve Pit Manifold Valves and Position Indication for Project W-314.
【24h】

Project W-314 Acceptance Test Report HNF-4643 for HNF-4642 241-AN-A Valve Pit Manifold Valves and Position Indication for Project W-314.

机译:项目W-314验收测试报告HNF-4643用于HNF-4642 241-aN-a阀门歧管阀和W-314项目的位置指示。

获取原文

摘要

The purpose of the test was to verify that the AN Tank Farm Manifold Valves can be manually manipulated to the required operating position and that the electrical and visual indications accurately reflect that position. Physical locking devices were also verified to function. The scope of the system tested by this procedure is limited to the valve actuator assemblies, the local interface panel, and the interface terminal connections for the remote control and indication functions that are to be installed in the future.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号