Rough order of magnitude cost estimate for immobilization of 18.2 MT of plutonium using existing facilities at the Savannah River site: alternatives 3B/5B/6C/6D/7B/9B

机译:使用萨凡纳河现场设施固定18.2吨钚的粗略成本估算:替代方案3B / 5B / 6C / 6D / 7B / 9B

获取原文

摘要

The purpose of this Cost Estimate Report is to identify preliminary capital and operating costs for a facility to immobilize 18.2 metric tons (nominal) of plutonium using ceramic in an existing facility (221-F) at Savannah River Site (SRS).