首页> 美国政府科技报告 >Second Line of Defense Port of Buenos Aires and Exolgan Container Terminal Operational Testing and Evaluation Plan Buenos Aires, Argentina.
【24h】

Second Line of Defense Port of Buenos Aires and Exolgan Container Terminal Operational Testing and Evaluation Plan Buenos Aires, Argentina.

机译:布宜诺斯艾利斯第二防线港口和Exolgan集装箱码头运营测试和评估计划阿根廷布宜诺斯艾利斯。

获取原文

摘要

The purpose of operation testing and evaluation (OT&E) is to validate and baseline an operable system that meets the Second Line of Defense (SLD) Program mission. An SLD system is defined as the detection technology and associated equipment, system operators, standard operating procedures (SOPs), and other elements including training and maintenance that support long-term system sustainment. This OT&E plan summarizes activities planned to meet the intent of the OT&E phase of the SLD project lifecycle. An OT&E report will outline the status of the entire system at the end of project implementation and is used by the sustainment team or other program stakeholders to modify or revise the sustainment strategy. The activities performed during the Exolgan Container Terminal and Port of Buenos Aires OT&E will help maximize the effectiveness of the systems and potential for continued host country operation of the radiation detection systems. Another objective of OT&E is to demonstrate that the radiation detection systems can be operated effectively in real time to the satisfaction of the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号