首页> 美国政府科技报告 >Long-Term Demonstration of Hydrogen Production from Coal at Elevated Temperatures, Year 6-Activity 1.12-Development of a National Center for Hydrogen Technology, Topical Report.
【24h】

Long-Term Demonstration of Hydrogen Production from Coal at Elevated Temperatures, Year 6-Activity 1.12-Development of a National Center for Hydrogen Technology, Topical Report.

机译:高温下煤的氢生产的长期证明,第6年 - 活动1.12-国家氢技术中心的发展,专题报告。

获取原文

摘要

The Energy & Environmental Research Center (EERC) has continued the work of the National Center for Hydrogen Technology (NCHT) Program Year 6 Task 1.12 project to expose hydrogen separation membranes to coal-derived syngas. In this follow-on project, the EERC has exposed two membranes to coal-derived syngas produced in the pilot-scale transport reactor development unit (TRDU). Western Research Institute (WRI), with funding from the State of Wyoming Clean Coal Technology Program and the North Dakota Industrial Commission, contracted with the EERC to conduct testing of WRI's coal-upgrading/gasification technology for subbituminous and lignite coals in the EERC's TRDU. This gasifier fires nominally 200500 lb/hour of fuel and is the pilot-scale version of the full-scale gasifier currently being constructed in Kemper County, Mississippi. A slipstream of the syngas was used to demonstrate warm-gas cleanup and hydrogen separation using membrane technology. Two membranes were exposed to coal-derived syngas, and the impact of coal-derived impurities was evaluated. This report summarizes the performance of WRI's patent-pending coal upgrading/gasification technology in the EERC's TRDU and includes the results of the warmgas cleanup and hydrogen separation tests.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号