首页> 美国政府科技报告 >Improving the Performance of a Mixed-Integer Production Scheduling Model for LKAB's Iron Ore Mine, Kiruna, Sweden
【24h】

Improving the Performance of a Mixed-Integer Production Scheduling Model for LKAB's Iron Ore Mine, Kiruna, Sweden

机译:提高瑞典基律纳LKaB铁矿的混合整数生产调度模型的性能

获取原文

摘要

LKAB operates the Kiruna underground iron ore mine, which utilizes a mining method known as large-scale sublevel caving. To optimize production scheduling at Kiruna, we present a combined (short- and long-term) resolution model using mixed-integer programming. The model, which incorporates various operational requirements unique to sublevel caving, minimizes deviations from demand to produce a schedule containing monthly time periods. However, the resulting model is large and solution times for schedules of requisite length are excessive. To expedite solution time, we develop a decomposition-based heuristic consisting of two phases: (i) solving five subproblems, and (ii) solving a modified version of the original model based upon information gained from the subproblem solutions. We compare the performance of the heuristic to solving the original model directly on 15 datasets. On average, we find that our heuristic obtains better solutions faster than solving the original problem directly. We present various limitations to our approach and suggest possible extensions by modifying the heuristic when solving for schedules of greater length.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号