Technical and Economic Feasibility of Salt-Gradient Solar Ponds at the Truscott Brine Lake of the Red River Chloride Control Project. A Report to the House-Senate Committee on Appropriations of the Ninety-Seventh Congress

机译:红河氯化物控制项目Truscott盐湖盐梯度太阳池的技术经济可行性。向众议院参议院第九十七届大会拨款委员会提交的报告

获取原文

摘要

The Truscott Brine Lake is being constructed to impound highly brackish water from a number of sources which would normally flow into the Wichita River, a tributary of the Red River in Knox County, Texas. A 35.4-km (22-mile) pipeline is being constructed to carry the brines from their primary source to the Truscott Brine Lake site. The reservoir is designed to contain 100 years of brine emissions from three chloride emission areas in the Wichita River Basin. The solar ponds and power generating facilities would be located in the Bluff Creek Arm of Truscott Brine Lake. The Truscott Brine Lake study includes: survey of suitability of Truscott Lake site, review of solar pond technology, preconceptual design of solar salt pond power plant, and economic evaluation. (ERA citation 08:023306)

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号